top of page

PROJECTS

Built During 2010 - 2012
The Cedars Sinai Medical Center click here to view project

 

275'  Peiner  Tower Crane OperatorWorked for Biggie Crane as a fill in operator as needed. Loaded and Unloaded Building Material to & from specific job site locations. Laid re-bar accross building floors and erected re-bar colums posts for iron workers. Work with carpenters, electrictions, plumbers and other trades through out the days worked.

Built During 2007 - 2009
The W Hotel Hollywood click here to view Project

 

300’ Tower Crane Operator
Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes. Operated 40’ forklift and warehouse forklift throughout job site delivering and unloading material.

Built During 2005 - 2007
Montage Hotel & Resort click here to view project

 

350’ Tower Crane - 40’ Boom Forklift - Man Lift Operator
Operated Man Lift of union crews to various floors with their equipment or materials. Organized and supervised four other man lift operators. Operated Tower Crane on overtime and weekend shifts for primary operator. Ran 40’ boom forklift throughout work site loading & unloading building material. Also operated warehouse forklift inside building zone.

Built During 2003 - 2005
Colburn School of Performing Arts click here to view project

 

287’ Tower Crane - 40’ Boom Forklift - Man Lift Operator
Operated Man Lift of union crews to various floors with their equipment or materials. Organized and supervised four other man lift operators. Operated Tower Crane on overtime and weekend shifts for primary operator. Ran 40’ boom forklift throughout work site loading & unloading building material. Also operated warehouse forklift inside building zone.

bottom of page