top of page

Marland Rene Love

Address: 964 E. Badillo Street #102

E-mail: marlandlove@gmail.com

Tel: 626-502-6235

Tower Crane, Manlift & Heavy Equipment Operator Info.
 

Languages

English 

Spanish

Thank you for taking to time to review my CV profile. I take pride in knowinig that I've accomplished a skill that not many are willing or able to acheive. I welcome any questions or comments. 

For My Work Experience Hard Copy: Click Here

Objective:  Heavy Equipment Operator

 

Experience: Please Review the Below 20+ Years of Work History

2019 - 2020  Mortenson Construction - Citizen M Hotel 

CLICK HERE > https://urbanize.la/post/11-story-citizenm-hotel-breaks-ground-downtown-los-angeles

Tower Crane Operator of Liebherr 550 Luffer (178ft) 

The citizenM Los Angeles Downtown, which is being developed in partnership with Los Angeles-based BLVD Hospitality, replaces a parking lot at the northwest corner of 4th and Spring Streets in the Historic Core.  Plans call for the construction of an 11-story building featuring 315 guest rooms. Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of the seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

 

2018 - 2019  Tuner Construction - The Manchester Pacific Gateway project (Phase #1)

CLICK HERE > https://www.manchesterpacificgateway.com/updates/

Tower Crane Operator of Liebherr 630 (450ft) and a Liebherr 420 (325ft) Hammer Heads

The largest private real estate project in San Diego—a $1.5 billion redevelopment of 12 acres of Navy land on the downtown waterfront. Manchester Financial Group held a ceremonial groundbreaking Friday for the Manchester Pacific Gateway, a complex of seven buildings — including regional headquarters for the Navy — that will open in three years. The project includes two hotels, 1.1 million square feet of office space, 391,000 square feet of restaurants and shops, 4.5 acres of public open space, and 2,400 underground parking spaces. The site is bounded by Broadway, Pacific Highway and Harbor Drive. Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of the seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

 

2018 - 2018  Suffolk Builders - Park Fifth Rise Project -

CLICK HERE  > https://urbanize.la/post/watch-dtlas-park-fifth-rise

Tower Crane Operator of 330ft free standing

Located on a property that fronts 5th, Olive and Hill Streets, the project consists of a high-rise tower and podium-type building that will feature a combined 660 apartments and nearby 14,000 square feet of ground-floor commercial space. Portland-based Ankrom Moisan Architects is designing both components of the development. Suffolk Construction broke ground on the 24-story tower at the beginning of March, while Bernards Bros. Inc. began work on the adjacent seven- story building in August 2016. Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

 

2017 - 2018  LendLease Builders - Oceanwide Plaza Project -

CLICK HERE > https://urbanize.la/post/crane-watch-dtlas-oceanwide-plaz

Tower Crane Operator of 800ft crane with 3 tie in points

The mixed-use complex, which is being developed by the Beijing-based Oceanwide Real Estate Group, will consist of three high-rise buildings on a 4.6-acre site across the street from Staples Center and L.A. Live.  The 49-story north tower, currently the second tallest building under construction in Los Angeles, will consist of 164 luxury condominiums and a five-star, 183 room hotel. The twin south towers will each rise 40 stories, featuring a combined total of 340 condominiums.  Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

 

2016 - 2017  LendLease Builders - Circa Project -

CLICK HERE > https://urbanize.la/post/two-tower-circa-development-debuts-south-park

Tower Crane Operator of 480ft crane with 2 tie in points

Located on a 2.7-acre site at 1200 S. Figueroa Street, the twin 35-story buildings featuring 648 luxury apartments which are built to condo specifications.  The mix of one- and two-bedroom dwellings - as well as three-bedroom penthouse - range between 600 square feet and 4,000 square feet, with rents between $3,000 per month and $25,000 per month. Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

 

2015 - 2015  Hollenbeck - 6th & Bixel Project -

CLICK HERE > https://urbanize.la/post/sixth-bixel-development-rises-city-west

Tower Crane Operator - 275 ft free standing

The $200-million development, located at 6th and Bixel Streets in City West, will consist of a pair of six-story structures designed by architecture firm Togawa Smith Martin.  When completed, the two buildings will comprise 606 residential units, 25,000 square feet of ground-level commercial space and parking accommodations for up to 762 vehicles. Other amenities include a fitness center, an outdoor swimming pool and multiple rooftop decks. Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

 

2014- 2015  Suffolk Construction - Sunset LaCienega -

CLICK HERE > https://urbanize.la/post/immense-sunset-la-cienega-project-shapes

Tower Crane Operator of 290 ft free standing

The $300 million project, named for its location at the intersection of Sunset and La Cienega Boulevards, will eventually consist of four mid-rise buildings, providing a mixture of hotel rooms, condominiums and premium retail and restaurant space. Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

 

2013 - 2014  Department of Water & Power (DW&P)

Heavy Equipment Operator

Worked on the solar power plant in Santa Clarita, Ca. in order to bring solar power to the local community. Operated 560 Compactor, D9 dozers, D4 dozers, Water trucks, Earth moving scraper and rock trucks. This project entailed the tearing down of a natural hillside mountain and refilling it with earth material and compacting it to the specifications in order to build the solar power plant.

2011 - 2012  SODO Builders - LA Marriott -

Man Lift Operator

Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

2011 - 2011 M - C Construction - Solar Structure Erection -

Skid Steer w/ (Auger 8', bucket, drill bit, Multiple attachments) & 40' Skytrak forklift

Cored out (asphalt) hole settings, augured 14' x2' diameter holes with skid steer. Set 20' cages & steal posts. Assisted with pouring cement, leveling, clean up. Set pre-lings 20 feet high with skytrack.

       

2010-2011 Swift Trucking Transportation Services

Operated eighteen (18) wheeler

Drove over the road (delivered and picked up in 12+ states) Drove Freightliner, Volvo, International rigs. Experienced in hooking up and unhooking 32 foot dry and refrigerated units. Earned a dedicated route with Dollar Tree stores for the tri-state area of California, Nevada, Arizona.

2009-2010  Hathaway Dinwiddie Consttion - Cedars Sinai Medical Center

350’ Tower Crane - 40’ Boom Forklift - Man Lift Operator

Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

2007–2009  Webcor Construction - N. Hollywood, CA (W Hotel Hollywood)

300’ Tower Crane Operator

Loaded and Unloaded Building Material too & from specific job site locations. Organized Safety issues pertaining to CDL drivers, union crews and site management for proper material delivery. Signaled by radio and hand to operators in & out of seat. Rigged loads for union crews for safe material delivery. Erected & Dismantled and performed Maintenance of Tower Cranes.

2005-2007  Pankow Const. Beverly Hills, CA (Montage Hotels & Resorts)

350’ Tower Crane - 40’ Boom Forklift - Man Lift Operator

Operated Man Lift of union crews to various floors with their equipment or materials. Organized and supervised four other man lift operators. Operated Tower Crane on overtime and weekend shifts for primary operator. Ran 40’ boom forklift throughout work site loading & unloading building material. Also operated warehouse forklift inside building zone.

 

2004 – 2006 Matt Construction , (Colburn School of Performing Arts)

287’ Tower Crane - 40’ Boom Forklift - Man Lift Operator

Operated Man Lift of union crews to various floors with their equipment or materials. Organized and supervised four other man lift operators. Operated Tower Crane on overtime and weekend shifts for primary operator. Ran 40’ boom forklift throughout work site loading & unloading building material. Also operated warehouse forklift inside building zone.

2003 –2004 All American Asphalt Corona, CA

HDR – Heavy Duty Repair (Rock Plant)

Manufacturing from blasting to shipping of various measurements of rock aggregate. Repair and replace 1 ton motors, bearings (LKS), shafts, belts and all parts of rock plant. Plant Welding and Steel fabrication of silos, conveyors, bins, and forms. Operated CAT 966 & 990 Articulating Loaders – CAT D4 & D9 Dozers – Dear Skip Loader – 4-‘ boom forklift and warehouse lifts.

1998 – 2003 Sully Miller - Blue Diamond Contracting - South Gate, CA

Asphalt Plant Operator

Scheduled material trucking for 12 to 100 various truck types and models for delivery. Operated CAT 966 front loader, loading trucks with material, loaded hopper w/ wrap material pushed and piled material on ground. Operated 40’ boom forklift and warehouse lifts. Operated drum & batch plants and performed preventative maintenance and major plant overhauls. Performed welding and steel fabrication on silos, conveyor belts, and daily observation.loader, loading trucks with material, loaded hopper w/ wrap material pushed and piled material on ground. Operated 40’ boom forklift and warehouse lifts. Operated drum & batch plants and performed preventative maintenance and major plant overhauls. Performed welding and steel fabrication on silos, conveyor belts, and daily observation.

Skills

Tower Crane Operation

Manlift Operation

18 Wheel  Big Rig / Over the Road

Welding

Loader Operator

Skip Loader Operator

40' Boom Fork Lift 

D4 - D9 Dozer Operator

Asphalt Plant Operator

Witch Ditch Operator

 

Licenses

Tower Crane Certification

Commercial Drivers License

Forklift  40' Boom Forklift Certification

OSHA 10 hour Certification

Rigging Certification (TBA)

 

2010 - present

2010 - present

bottom of page